Start date: 01.11.2015
Duration:
Coordinator: TECNALIA
Budget:
Details
FASSTbridge aims at drastically reduce the economic and environmental costs of ownership of the steel bridges stock in Europe and the USA by providing a reliable preventive, cost-effective and sustainable solution for steel bridges life-time extension.
The FASSTbridge solution will stand on two pillars:
- FASSTbridge methodology: an easy-to-apply methodology (fatigue life-time assessment, design, execution and maintenance guideline) to prevent the evolution of irreversible fatigue derived problems at a pre-failure scenario, and
- FASSTbridge strengthening system: a reliable, cost-effective CFRP strengthening system to preventively extend life-time of steel bridges.
List of achievements
Contact
Contact person: Maria Zalbide
Address:
Tel: + 34 667 119 769
email: maria.zalbide@tecnalia.com
Status
Finished